How much deposit should a freelancer ask for?

ยท 10 min read

Most freelancers ask for too little, too late, or with no conditions attached. Here is what a deposit is actually for, the percentages that work, and the wording that gets it paid without a negotiation.

The question sounds like it has a number for an answer, and most advice obliges with a range: 25 percent, 50 percent, a third. Those numbers are not wrong, but they answer the wrong question. A deposit is not a tip for enthusiasm or a test of whether the client trusts you. It is the money that lets you start work without carrying the whole risk of the project, and the right figure is the one that covers what you spend before the first invoice is due.

Get that order right and the percentage becomes obvious. Get it wrong and you end up with a deposit that feels like a negotiation, a client who resents it, and a project that is still unpaid in month three.

The short answer

For most project work, 30 to 50 percent up front is normal, with the rest on delivery or across milestones. Long engagements are better split into monthly payments or milestones than a single deposit. Retainers are paid in advance for the month. The number matters less than the condition attached to it: what the deposit covers, whether it is refundable, and what happens if the project is cancelled. A deposit with no conditions is just a smaller invoice with more hope.

Why a deposit is not about trust

Freelancers often avoid asking because asking implies distrust, and distrust is uncomfortable in a relationship they want to be collaborative. The client, meanwhile, is not insulted by a deposit; they are used to paying one for a venue, a solicitor or a builder. What reads as unprofessional is not the request, it is the vagueness around it: a deposit that appears for the first time in an invoice, with no explanation and no terms.

A deposit also does something quieter than protecting cash flow. It converts interest into commitment. Clients who are still deciding often agree to a proposal and then drift; a deposit request is the point where the project either becomes real or reveals that it was never funded. Discovering that in week one is much cheaper than discovering it in week six, when you have already turned down other work.

The rule that matters more than the percentage

Work backwards from your costs. Add the software, subcontractors, stock, travel and any deposit you pay on the client's behalf, plus the hours you will spend before the first milestone payment lands. That number is your floor. If 25 percent does not cover it, the percentage is too low for this project regardless of what is normal in your field.

Then think about exposure. A three-week website is a small risk; a six-month brand programme with a large subcontracted print run is not. The longer the project and the more you spend on the client's behalf, the more the payment schedule should look like a series of small bets rather than one large one.

Choosing a number for your situation

Project work under a month: 50 percent up front and 50 percent on delivery is simple, common and easy to explain. Work that runs for months: a smaller mobilisation payment, then equal monthly invoices or milestone payments tied to deliverables the client can see. Retainers: the full month in advance, because the retainer buys availability rather than output, and availability is consumed whether or not the client uses it.

For new clients, the first project can carry a higher deposit than later ones, and it is reasonable to say so: new clients start at 50 percent, returning clients at 30. That is not a penalty, it is the same logic a landlord uses. If a client pushes back hard on any deposit at all, treat that as information about how the invoices will go later.

How the deposit interacts with milestones

A deposit plus milestones is a different schedule from a deposit plus a final invoice, and the second is where freelancers get caught. A 40 percent deposit with the remaining 60 percent on delivery means you carry 60 percent of the value for the whole project. Three payments of 40, 30 and 30 means you are never more than a third behind.

Set the milestones at points where the client receives something they can see: the design approved, the build on staging, the site live. Milestones attached to your own internal phases invite arguments about whether the phase is finished; milestones attached to something the client can look at do not.

The last payment should never be conditional on the client publishing, launching or using the work. Handover is the moment your job ends, and tying the final invoice to their internal deadline gives someone else control of your cash flow.

A worked example

A 6,000 website over six weeks with 900 of stock photography and two days of a subcontractor. Your costs before the first milestone are roughly 1,400 plus about 30 hours of your own time, so the floor is comfortably above 2,000.

A schedule that works: 3,000 on signature, 1,800 when the site is on staging, 1,200 on go-live, with the photography billed at cost in the middle invoice. You are never more than three weeks of your own time exposed, the client always has something to see before paying, and the final invoice is small enough that it is not worth delaying.

A schedule that does not work: 1,200 on signature, 4,800 on delivery. It looks gentler to the client and it means you finance the project. If the launch slips by a month, so does most of your fee, and the delay is the moment you can least afford it.

How to ask without making it awkward

Put it in the proposal, not in a separate conversation after the yes. One line is enough: the project starts with a 40 percent deposit, which covers the research and setup, with the balance on delivery. The invoice goes out with the contract, and work begins when it clears. Saying when work begins is the part that makes the request feel like a process rather than a favour.

If the client asks to reduce it, do not simply agree. Reduce the scope to match, or move the first milestone earlier so the money arrives sooner. What you are protecting is not the percentage but the principle that you are never far ahead of your invoices.

When procurement blocks it

Large organisations sometimes cannot pay a deposit at all: their system will only pay against a delivered invoice. In that case, ask for a purchase order before you start, since a purchase order is the corporate version of a deposit, and split the work into two invoices where the first is delivered in week two rather than week six.

If neither is possible and the amount is significant, price the risk: a slightly higher fee for extended terms, or a shorter first phase that limits your exposure. What you should not do is start a large project with no commitment and hope the invoices behave, and certainly not on the strength of an email from someone who cannot approve spending.

What to put in writing

Four things, in plain English. What the deposit pays for. Whether it is refundable, and until when. What happens to it if the client cancels, and what happens if you do. And when the balance is due. A deposit described as non-refundable once work has started is normal; a deposit described as non-refundable with no explanation will start an argument you do not need.

This article is general information rather than legal advice, and the rules differ by country, so keep the wording simple and, for anything large, have a professional read it once. The goal is a clause both sides understand without a lawyer in the room.

When the client asks for the deposit back

It happens most often when a project is cancelled in the first fortnight, and the fair answer usually depends on what has already been done. If you have spent two days on research and the client cancels, the deposit covers that work and the remainder is returned; if you have delivered nothing and spent nothing, returning it is reasonable and protects your reputation.

Say what you are doing and why in one short message, with the hours listed. A partial refund explained in three lines ends the conversation; a refund argued over does not, and a refund refused without explanation invites a chargeback and a review. The clause you wrote in week one is what makes this paragraph short.

What the deposit does not fix

It does not fix a client who will not pay the balance, a scope that was never defined, or a project with no written agreement. It is one control among several: payment terms, a change process and an approval step do the rest. Treat the deposit as the first of those controls rather than the whole safety net.

Deposits for products as well as services

If you sell a physical product alongside your services, the deposit has a second job: it funds materials. In that case the percentage should follow the bill of materials rather than the project length, and the deposit should be at least the cost of anything you cannot return.

Say when the deposit stops being refundable, because it usually converts into materials at a specific moment: on the date the order is placed with the printer, or when the fabric is cut. A deposit with a stated conversion point is easy to explain and easy to defend, and it removes the argument about whether the work had started.

A one-line clause library

Four sentences cover most small projects, and they can be pasted into a proposal with the numbers changed. The project starts with a deposit of X percent, which covers the work up to the first milestone. Work begins when the deposit clears and the signed agreement is returned. The deposit is refundable in full until work starts and non-refundable afterwards, less any hours already spent. The balance is due within 14 days of the final invoice.

Read those four sentences as a client and nothing is ambiguous: what to pay, when, what it buys, and when the rest is due. That clarity is the whole product of this article, and it takes less time to write than the first email asking for the deposit would take to compose.

Frequently asked questions

Is 50 percent too much to ask? No, for project work under a month it is common and easy to justify. It becomes too much when it is asked for without explaining what it covers.

Should the deposit be non-refundable? It should be non-refundable once work has started, which protects the time you have already spent. Before work starts, a refund is usually the fair outcome.

What if the client is a large company that only pays on 60-day terms? Ask for the deposit to be paid by card or on a separate shorter invoice, and get the payment route agreed before the contract is signed.

Do I charge tax on a deposit? Usually the same treatment as the final invoice, because it is a payment towards the same supply. Check your local rules once rather than guessing per project.

What if the client wants to pay the whole project up front? Take it, and say what happens if the project expands: the extra work is quoted separately rather than absorbed into a fee already paid.

The takeaway

Pick a deposit that covers your costs before the first milestone, explain what it buys, say when work begins, and put the conditions in the agreement rather than in your head. The number will vary by project and by client. The clarity should not.

Related on Revercue

All posts